Merge Split Schedules on Sheets
- On a sheet that displays a split schedule, select the schedule. Use the 4-way arrow control to drag one schedule segment over the other segment.
- Release the mouse button. The split schedule segments merge.
Can you merge cells in Revit schedule?
select cells in one or more rows and click (Delete Row). select header cells to be merged and click (Merge). Select merged cells and click (Merge) again to separate merged cells.
How do I merge split schedules in Revit?

You can rejoin the sections of a split schedule on a sheet. When you select the schedule on a sheet, a 4-way arrow control displays in the upper left corner of each section of the schedule. Use this arrow control to drag and drop a section of the schedule over another section to join them.
How do I split a cell in a schedule in Revit?
Split a Schedule on a Sheet

- Open the sheet.
- Select the schedule on the sheet.
- Click the Z break control.
- To split a section of the schedule further, click the Z break control again.
- To adjust the number of rows in a section of the schedule, drag the blue dot at the bottom of the first section.
Which osnap can be used to snap onto the justification point of a text?
Extension. The Extension Osnap enables you to snap to some point along the imaginary extension of a line, arc or polyline segment. To use this osnap, you must hover the cursor over the end of the line you want to extend.
How do you update a table in AutoCAD?
Updating Table Data
- Right-click a table and click Table Properties.
- In the Table Properties dialog box, click Force Content Update. Note. You can select this option only when the Reactivity Mode is set to Static.
- Click OK.
What is shared parameter in Revit?
Shared parameters are definitions of parameters that you can add to families or projects. Shared parameter definitions are stored in a file independent of any family file or Revit project; this allows you to access the file from different families or projects.
How do I add a dimension to a schedule in Revit?
Click Annotate tab Dimension panel (Aligned). On the Options Bar, select Wall Faces, and for Pick, select Individual References….Add Dimensions
- Click the exterior face of the west wall.
- Click the exterior face of the east wall.
- Move the cursor above the building, and click to place the dimension.
How do you unsplit a schedule table in Revit?
On a sheet that displays a split schedule, select the schedule. Use the 4-way arrow control to drag one schedule section over the other section. Release the mouse button. The split schedule sections rejoin into one section.