How long does BART last?
Table of Contents
Starting August 2, 2021, BART will expand its hours and significantly increase service: Weekday service will be 5am-12am (currently 5am-9pm) with 15-min frequencies on all lines from 5am-8pm and 30-minute frequencies from 8pm-midnight.
How long does the BART take?
BART (Bay Area Rapid Transit) provides one of the world’s best airport-to-downtown train services. BART takes you downtown in 30 minutes for only $5.35 one-way or $10.70 round trip.
Does BART run 24 hours?
BART is now running until midnight on all days. BART will also run 5-line service on Sundays for the first time ever when there is no single-tracking due to cable replacement work in San Francisco.

When did BART start?
September 11, 1972Bay Area Rapid Transit / Began operation
How late does BART run from Oakland Airport?

Oakland International Airport (OAK)
SERVICE HOURS | |
---|---|
Weekdays | 5 am – Midnight |
Saturdays | 6 am – Midnight |
Sundays | 8 am – Midnight |
How late does BART run from Oakland airport?
How long is BART ride from Dublin to San Francisco?
1h 25m
The best way to get from Dublin Pleasanton BART to San Francisco Airport (SFO) without a car is to BART which takes 1h 25m and costs $13 – $18.
Does BART run past midnight?
With this schedule change, BART will operate midnight service every night of the week. Highlights include: Extend service to midnight on Sundays. Run 5-line service every day (except for single-tracking Sundays) until about 9pm.
How long is the BART tunnel under the bay?
3.6 mi
The Transbay Tube is an underwater rail tunnel that carries Bay Area Rapid Transit’s four transbay lines under San Francisco Bay between the cities of San Francisco and Oakland in California….Transbay Tube.
Overview | |
---|---|
Operator | San Francisco Bay Area Rapid Transit District |
Character | Rapid transit |
Technical | |
Line length | 3.6 mi (5.8 km) |
When was BART finished?
BART construction officially began on June 19, 1964, with President Lyndon Johnson presiding over the ground-breaking ceremonies at the 4.4-mile (7.1 km) test track between Concord and Walnut Creek in Contra Costa County. The system was scheduled to be completed in 1971.