What is chainage of a road?
Table of Contents
The distance of any point along the road is denoted by its chainage, being its distance, measured along. the road centre line, from a chosen origin or start point of the road. Chainage refers to a technique of. measurement where steel chains of 100 links were once used to measure distances.
What is difference between chainage and offset?
As nouns the difference between chainage and offset is that chainage is (surveying) an imaginary line used to measure distance, often corresponding to the centre of a straight road while offset is anything that acts as counterbalance; a compensating equivalent.

What do you mean by chainage and offset describe in brief?
The word “chainage” as used today indicates the centerline of a linear structure, such as a road or pipeline. It’s used in conjunction with “elevation” and “offset” to draw up construction plans.
How do you write road chainage?
In surveying,chainage is the measurement of horizontal or curvi-linear path between two points on the surface of earth. It is written as 0+ 000 m where the first 0 is in kilometer and later one is in meter itself. It clearly denote the distance between two points.

What are different types of offsets?
The offsets are classified according to direction and length, according to direction it is of two types i.e., perpendicular offsets and oblique offsets, according to length i.e., short offsets and long offsets.
How is chainage measured in road?
The term ‘chainage’ is used in surveying to refer to a distance measured in meters along an imaginary line, such as the centre line of a road or railway.
How do you read a road chainage?
What is Traverse method?
Traverse is a method in the field of surveying to establish control networks. It is also used in geodesy. Traverse networks involve placing survey stations along a line or path of travel, and then using the previously surveyed points as a base for observing the next point.
How offsets are measured and recorded?
Offset Method Set up two control points on site, through the middle of the area to be recorded ensuring a clear line of sight between them. Lay a tape measure between the two points, ensure that the tape is at the correct tension. Ensure each point is securely fixed, as it will be pulled on by the tape measure.